Creating the conditions to deliver housing at scale across Australia 2026 THE HOUSING OPERATING MODEL
INTRODUCTION
Australia needs more housing, delivered faster and at scale.
Government policy has increasingly focused on unlocking housing supply, combining planning reform, land and infrastructure investment, funding social and affordable housing and measures to improve project viability. Yet despite these efforts, many projects continue to stall, shrink or fail to proceed because the elements needed for delivery do not align at the same time. The challenge is not simply a shortage of housing. It is the complexity of delivering it. Housing is often approached as a series of individual initiatives, when in reality it operates as an interconnected system. Decisions relating to land, planning, infrastructure, construction, capital and operations are deeply interdependent, and even well-supported projects can fail when one critical barrier remains unresolved. As Australia seeks to increase housing supply, attention must shift from targets alone to the systems that enable delivery. This requires a more coordinated approach to government decision-making, greater alignment between capital and housing opportunities, and a deeper understanding of the housing products communities actually need. In this report, Cushman & Wakefield explores the structural barriers limiting housing delivery at scale and examines how government, investors, housing providers and communities can work together to create the conditions for successful delivery. Our findings suggest Australia needs a housing operating model, not simply another housing target.
2
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
Australia needs more housing, delivered faster and at scale. But ambition alone will not convert land, funding commitments or planning reform into completed homes. The harder task is aligning the decisions, capital and housing products required to move projects from policy intent to delivery. HOUSING DELIVERY NEEDS AN OPERATING MODEL, NOT ANOTHER TARGET
Australia’s housing challenge is not in dispute. Governments are setting supply targets, releasing land, reforming planning systems and funding social and affordable housing. Yet many projects continue to stall, shrink or fail to proceed because the elements needed for delivery do not line up at the same time. That introduces the central problem. That is, housing is often approached as a series of related initiatives, when in practice it must operate as a single delivery system.
Because decisions about land assembly, planning, infrastructure, design, construction, funding, tenure and investment are interdependent, even when a project fulfils a need and has policy support, it can still fail if one critical approval, cost or risk is unresolved.
Our perspective comes from working across that system, including:
HOUSING PROVIDERS
CORPORATES, OPERATORS AND EMPLOYERS seeking staff accommodation and assess their asset portfolios.
GOVERNMENTS seeking to assemble and release land and accelerate supply.
INVESTORS assessing whether housing opportunities offer sufficient scale, certainty and risk- adjusted return.
and developers trying to make projects feasible and secure funding.
When all these different vantage points are considered, three opportunities stand out.
1
2
3
Create a way to resolve competing government mandates
Turn housing need into investable opportunities
Match supply with the right housing product and location
3
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
Planning authorities protect the long-term quality and liveability of cities. Building regulators focus on safety, quality and environmental performance. Land and infrastructure agencies need to service sites and manage land-release outcomes. Treasury and tax agencies protect revenue and fiscal discipline. Housing agencies seek to expand social and affordable supply. Housing delivery touches many parts of government, each with a legitimate mandate. The difficulty arises when these mandates are applied sequentially or in isolation. A decision that is rational within one portfolio can undermine the viability of the project as a whole. CREATE A WAY TO RESOLVE COMPETING GOVERNMENT MANDATES
HOUSING Expanding social and affordable supply
PLANNING Long-term quality and liveability
HOUSING DELIVERY
TREASURY & TAX Revenue and fiscal discipline
BUILDING REGULATION Safety, quality and environmental performance
LAND & INFRASTRUCTURE Servicing sites and managing land release
4
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
CASE STUDY
THE PROJECT BEGINS WITH STRONG ALIGNMENT Through a prior government land release and funding program, the State Government and a community housing provider (CHP) were working towards the shared objective of delivering social and affordable housing, with grant funding and concessional finance also available to support delivery. On paper, the ingredients appeared to be in place, including public land, an identified housing need, a capable delivery partner and a funding program actively seeking viable CHP-led projects. A GOVERNMENT AND COMMUNITY HOUSING PROVIDER COLLABORATION
THE FIRST CONSTRAINT WAS LAND Although it was being released for a social and affordable housing purpose, government policy required it to be sold at market value, which is a standard process across many Governments (with varying flexibility across the nation). The site comprised small townhouse lots on constrained, sloping land, and the full market-value land cost remained despite the below-market housing outcome being sought. A discounted land contribution, deferred payment or other value-sharing mechanism may have supported viability at the outset. Instead, the CHP had to solve for the full land cost within an already tightly constrained project feasibility. THE CHP’S RESPONSE The CHP proposed amalgamating the separately titled lots and revising the built form to increase yield, including townhouses and a low-rise apartment component. The higher-yield scheme was designed to absorb the high land price, improve value for money and keep the social and affordable housing project viable.
THE CUMULATIVE IMPACT In this case, one part of government was calling for viable CHP-led projects, while the combined effect of land and planning settings elsewhere prevented this project from proceeding. Government had land and funding available, but the land- pricing policy embedded a viability gap. When the CHP developed a higher-yield response to overcome that gap, a separate planning position prevented the solution from progressing. Each decision could be explained within its own mandate, yet together, produced the opposite of the whole- of-government objective. This resulted in no project, no drawdown of the available funding and no additional social or affordable homes. Similar challenges can be observed across many housing projects, where authority requirements, utility interfaces, environmental and heritage considerations, planning processes and multiple approval points can collectively create a risk environment that undermines project feasibility and, ultimately, prevents projects from progressing. Major infrastructure projects often address this by bringing these issues together under a single governance and delivery framework, sometimes supported by project-specific legislation, to resolve interdependencies concurrently rather than sequentially.
THE SECOND CONSTRAINT WAS PLANNING
The second constraint emerged when the CHP sought the planning support required to demonstrate funding readiness. The revised scheme did not align with the original planning intent for the site, so planning support was not provided. Without that support, the project could not satisfy the grant program’s requirements and was ultimately not funded.
5
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
THE PRACTICAL OPPORTUNITY
Housing delivery would benefit from the same integrated approach, including the initiatives outlined below:
Rather than have decisions made in isolation, a mechanism to consider their cumulative impact is needed.
Establish senior housing delivery governance With authority to resolve cross-agency conflicts and make risk-informed decisions.
This includes costs, benefits, risks and trade-offs, recognising that individually rational decisions can collectively undermine the broader housing objective. Boards routinely make decisions in this way, considering commercial, financial, legal, operational and reputational risks together rather than allowing any one discipline to determine the outcome by default.
Require a consolidated view of project impacts Across economics, public value, planning outcomes, infrastructure needs and delivery risk before key decisions are made.
Create defined escalation pathways With decision timeframes for priority projects.
Distinguish between non- negotiable standards and flexible areas
Where an alternative solution or offset may achieve a better whole-of-government outcome.
6
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
TURN HOUSING NEED INTO INVESTABLE OPPORTUNITIES
With public funding constrained, private capital will be critical to delivering Australia’s housing need, but opportunities must meet investors requirements. Feedback from investors, particularly infrastructure investors, is that the capital is available to be deployed, but requires sufficient scale, a credible pipeline with deployment certainty, clearly allocated risk, reliable governance and returns that reflect the development and operating risks being taken.
. HOW ALTERNATIVE REAL ASSET CLASSES ATTRACT CAPITAL DIFFERENTLY
Capital must be matched to the risk profile and stage of development, which means development capital and long-term investment capital are not interchangeable. After all, funding land acquisition and construction exposes investors to planning, procurement, cost, program, market and completion risk. By contrast, investment in a completed and stabilised housing asset is driven more heavily by occupancy, rental income, operating performance and long- term asset value. This creates a challenge in the current market. Capital is often needed most during development, when rising construction costs and constrained feasibility can make projects least attractive to long-term institutional investors. Housing projects therefore need to be structured in ways that support institutional investment. This may include aggregating projects into a scalable pipeline, resolving enabling infrastructure early, improving revenue certainty and separating development risk from long-term ownership.
With pressure on Federal and State governments to open up supply, there is a shift towards thinking of housing more as an infrastructure asset. The way in which institutional capital evaluates other real asset classes, including infrastructure, offers valuable lessons for housing. These sectors are not risk-free, but investors can more readily assess a defined asset, contracted or regulated revenue, experienced counterparties and a repeatable delivery model. Housing is often presented as a collection of individual development projects, with demand evident but revenue, planning, construction and operating risks still bundled together. The table on the following page compares housing and infrastructure from an investor perspective, illustrating the factors that influence investment decisions.
Co-investment and other risk-sharing mechanisms may also help bridge the development phase.
7
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
WHAT HOUSING CAN LEARN FROM INFRASTRUCTURE: CREATING GREATER CERTAINTY FOR CAPITAL DEPLOYMENT
LARGE-SCALE INFRASTRUCTURE
HOUSING DEVELOPMENT
Often supported by regulated charges, availability-style payments, long-term capacity contracts or creditworthy counterparties.
Usually dependent on sales, occupancy and rent growth, with limited contracted revenue before completion.
REVENUE VISIBILITY
Large assets and established platforms can deploy substantial capital with repeatable governance and reporting.
Projects are frequently fragmented by site, jurisdiction, tenure and delivery partner, making aggregation difficult.
SCALE AND PIPELINE
Planning, construction, operating and demand risks can be separately allocated through project contracts.
Land, approval, construction, leasing and operating risks are often concentrated in the project or developer.
RISK ALLOCATION
Mature sponsors, operators, lenders and advisers provide a visible delivery track record
Institutional housing platforms and lower- density Build-to-rent (BTR) operators remain less mature in Australia
OPERATING CAPABILITY
Established asset classes, transaction evidence and operating benchmarks support valuation and refinancing.
Development-stage housing has uncertain completion value; emerging rental products have thinner operating and transaction evidence.
EXIT AND VALUATION
WALKING IN INVESTORS’ SHOES Superannuation funds are often seen as the solution to accelerating investment in housing, and on the surface, the proposition is compelling. Australia has a large pool of long-term investors with the capacity to narrow the housing shortfall, but super funds invest according to their mandates and obligations to members. Housing opportunities therefore must meet requirements around scale, risk, governance, valuation, liquidity and returns.
Development-stage housing can involve illiquid exposure, uncertain timing and valuation, construction and completion risk, and limited operating history. Superannuation trustees also need to manage liquidity and maintain robust valuation governance around unlisted assets. APRA has identified valuation governance and liquidity risk as important considerations for superannuation investment in unlisted real assets. 1
THE CAPITAL EXISTS, BUT HOUSING MUST COMPETE FOR IT (Percentage of total allocation at June 2026)
Australian superannuation assets $4.87tn
invested in Australian and international listed equities $1.77tn (55.7%)
invested in listed and unlisted property* $201 b (6.3%)
Source: APRA, Quarterly Superannuation Performance Statistics, June 2026; ASFA Super Stats, September 2026
*Note: property includes commercial and residential property and therefore should not be interpreted as housing investment alone. 1. https://www.apra.gov.au/news-and-publications/governance-unlisted-asset-valuation-and-liquidity-risk-management
8
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
Housing is also inherently more difficult to invest in efficiently. A large super fund can deploy hundreds of millions of dollars into a diversified equities portfolio quickly and easily, whereas achieving the same level of investment in housing may require multiple developments, each with different sites, approvals, delivery risks and operating arrangements. With relatively lean investment teams, institutional investors favour opportunities that offer scale, efficient deployment and low day-to-day management. These teams will prefer investing larger amounts of capital into major projects, platforms and programs, rather than spreading investment across multiple smaller projects. WHAT INSTITUTIONAL CAPITAL NEEDS TO INVEST This shifts the question from how to increase super fund investment to what does a housing investment vehicle, platform or program need to look like for institutional capital to invest.
AustralianSuper and HESTA have backed Assemble as an integrated national housing platform, while the Victorian Government’s aggregation of government-owned land, precinct planning and State and Federal government investment in enabling precinct infrastructure helped create the conditions for the Hamton and Hostplus partnership to commit to more than 5,400 homes at Arden Central. Different forms of capital may also be better suited to different stages of the housing lifecycle. Government, developers, specialist managers and mid-market capital may be better placed to absorb some early-stage and development risk, creating a pathway for larger institutional investors to participate once projects or portfolios have been sufficiently de-risked and operating performance is demonstrated. HOW GOVERNMENT CAN BETTER ENABLE INSTITUTIONAL INVESTMENT Governments do not generally expect private capital to absorb every risk associated with a major infrastructure project, but they can create an environment that better enables institutional investors to invest. This will involve identifying which risks government can influence, which risks the private sector can manage and whether a different allocation could unlock delivery and enhance whole-of-system value.
The answer may involve:
BUILD SCALE AND INVESTABILITY Can an investor deploy enough capital efficiently?
• Greater revenue certainty • Debt or partnership structures • Separation of development risk from long-term ownership STRUCTURE RISK AND RETURNS Can an investor take the right risks for an appropriate return?
Depending on the project, that role could include:
• funding or delivering enabling infrastructure that would otherwise make the project unviable;
• Established
• aggregating sites or demand to create an investable pipeline rather than offering isolated projects;
operating platforms • Diversified vehicles • Aggregated portfolios
• co-investing through joint venture or partnership structures with clearly defined risk and reward;
• using long-term leases, nominations, early stage revenue underwriting or availability-style payments, or other demand support where there is a demonstrable public- service requirement; and
Emerging Australian models show that institutional capital can be mobilised to deliver housing where there is scale, an established delivery platform and a credible pipeline.
• consolidating federal, state and local available funding and coordinating across different levels of Govt.
2. https://assemble.com.au/media-centre/housing-boost-assemble-and-super-housing-partnerships-merge 3. https://www.development.vic.gov.au/news/developer-selected-to-deliver-more-than-5,400-homes-at-arden-central
9
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
CASE STUDY
MOBILISING PRIVATE CAPITAL FOR HOUSING DELIVERY
HOUSING AUSTRALIA SOCIAL AND SUSTAINABLE BOND PROGRAM An example of how private investment has been marshaled to effectively support the delivery of social and affordable housing has been Housing Australia’s Social and Sustainable Bond program, from 2019 until 2025 the program has been able to raise $2.8b from the private market which has been deployed into community housing projects.
UK GOVERNMENT CO-INVESTMENT MODEL The UK is taking a direct approach to mobilising institutional capital into housing. Nearly £86 billion has been earmarked for government co-investment in housing projects across regeneration regions within a single joint-venture vehicle with Patrizia (a European living sector investment manager). This vehicle aims to deliver 4,000 new homes with more than £3 of private capital for £1 of government investment. Government guarantees further reduce development risk and financing costs. The model is understood to be structured to include more than social/affordable housing to support market and mixed- tenure development, with direct engagement between the vehicle and local government mayoral authorities to inform local housing needs, and unlock precinct-wide opportunities through early-stage investment and commercial sharing of risks and holding costs. By absorbing some of the risks that institutional investors are least equipped to carry, while preserving commercial returns and a clear pathway to exit into stabilised housing assets, the model creates a more investable proposition for large-scale pension and superannuation capital. We understand that Australian Superannuation funds have been contacted by Patrizia for potential investment into this vehicle, seeking to tap into this deep pool of funds.
Housing Australia - Social and Sustainability Bonds Issued To Date
3,000
2,500
2,000
1,500
1,000
500
0
2019
2021
2023
2025
2027
Bond 1
Bond 2
Bond 3
Bond 4
Bond 5
Bond 6
Bond 7
Source: Housing Australia, Investor relations - bond issuances to date (housingaustralia.gov.au/investor-relations)
10
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
Australia needs to increase housing supply, but aggregate targets can obscure the question that ultimately determines whether housing meets community need. That is, what type of home, in which location, at what price and for which households? MATCH SUPPLY WITH THE RIGHT HOUSING PRODUCT AND LOCATION
The underlying issue is that housing demand is not uniform. It varies by household size, life stage, income, tenure preference, employment location and access to services. Regional markets can need smaller and more diverse housing types but lack the project scale, construction depth or achievable rents to make them viable. Meanwhile, metropolitan markets can deliver substantial apartment supply while still leaving unmet demand for family-oriented or lower-density homes. The implication is that supply programs should begin with a granular understanding of demand, then test whether the preferred product can be delivered commercially. this includes identifying key constraints before land is released or funding rounds commence. This tension is evident in Canberra, where working data for the ACT Housing Supply and Land Release Program indicates that almost 90 per cent of planned dwellings over the five-year program are multi-unit. However, demand for detached and family-oriented housing remains a prominent part of the market.
CANBERRA’S COMPOSITION OF PLANNED HOUSING SUPPLY (2026-27 to 2030-31)
Standalone dwellings 2,885 planned dwellings 11% Social and affordable dwellings (2026-27) 300 new homes 15% Multi-unit dwellings 22,909 planned dwellings 89%
UPFRONT CRITERIA THAT SHAPES HOUSING SUPPLY
Source: https://www.abc.net.au/news/2026-06-09/act-government-land- release-housing-suppy-plan/106775294
TYPOLOGY What type of housing is needed?
The ACT’s missing-middle reforms recognise the need for greater housing diversity through duplexes, terraces, townhouses and low-rise apartments. However, planning reform alone may not translate into delivery if the broader feasibility and investment constraints outlined above remain unresolved.
TENURE How should it be occupied or accessed?
FEASIBILITY Can it be delivered commercially?
TIMING When is it needed?
LOCATION Where is it needed?
PRICE POINT What price or rent can the target household sustain?
1 1
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
EXPANDING THE PRODUCT TOOLKIT Australia may also need to broaden the range of housing products capable of attracting long-term capital. Established sectors such as purpose-built student accommodation (PBSA), retirement living and social and affordable housing are structured around the needs of defined resident cohorts, supported by operating models tailored to that demand. Could the same thinking apply to worker accommodation? In locations where access to housing is critical to attracting and retaining essential workers, housing can be considered as enabling infrastructure that supports employment, productivity or broader economic activity. The Australian Defence Force’s Single LEAP program provides a useful precedent. Defence had a clearly defined accommodation requirement linked to recruitment and retention, which it aggregated across multiple locations into a long-term investment proposition. Through two public-private partnership phases, the private sector designed, financed, built and now maintains more than 4,400 on-base accommodation units. Single LEAP 2 alone delivered 3,015 units across 14 bases under a 33-year design-build-finance-maintain arrangement. While the Defence PPP may not be replicable across every setting, the lesson is that a defined accommodation need can be translated into an investable proposition through scale, aggregation, contractual certainty and a clear operating model. This approach could also be applied to Renewable Energy Zones (REZs) and other major regional infrastructure projects that place additional pressure on local housing markets, particularly in areas already struggling to provide worker accommodation for agriculture and other regional industries.
BROADENING THE BUILD-TO-RENT MODEL Build-to-rent could also evolve to serve a broader range of households and markets. In Australia, BTR has largely been associated with high-density apartments in major cities. In the United States, the model has expanded into townhouses, cottages, detached homes and mixed-product communities, demonstrating how different rental products can respond to different household needs and market conditions. This broader approach could be particularly relevant for families seeking more bedrooms and private outdoor space, or in suburban and regional markets where apartment-based BTR may be less suited to local demand.
12
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
CASE STUDY
A DIFFERENT APPROACH TO BTR PRODUCT Village of Chandler shows how the rental model can extend beyond a conventional apartment building. The professionally managed community offers one-, two- and three-bedroom apartments alongside detached, townhome-style rental dwellings. VILLAGE OF CHANDLER, ARIZONA
Homes include private enclosed yards or patios, while leasing and management are centralised across the community. 5
Australia’s BTR market is, however, still maturing. It has fewer established operators, a shorter operating history and less transaction evidence than mature overseas rental markets, making underwriting, valuation and exit risk more difficult for institutional investors. In the near term, emerging BTR products and markets may therefore be better suited to specialist managers, developers and investors willing to take platform-building and operating risk. As the sector develops, stronger operating capability, greater transaction evidence and larger pipelines could provide a pathway for these models to attract larger pools of long-term institutional capital.
The product is differentiated by housing choice and private outdoor space, while retaining the operating model of a single managed rental asset.
HOW THIS COULD APPLY TO AUSTRALIA
The opportunity is not necessarily to replicate US models, but to consider how BTR products could be better matched to local housing demand. A single rental platform could incorporate different housing typologies, allowing it to serve a broader range of households and potentially support BTR in markets where conventional high-density apartments are less appropriate.
13
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
RETHINKING THE HOUSING DELIVERY MODEL
Coordination is necessary, but is unlikely to be the solution on its own. The focus should be on creating a structures that support decision making, capital deployment and ensures the right housing is delivered.
THREE ACTIONS TO UNLOCK DELIVERY 01
02 Structure housing for the capital you are seeking Start with the investor’s perspective. Understand the mandate, risk appetite, return requirements and investment characteristics of target investors, then structure projects and pipelines accordingly. What this means in practice Aggregating opportunities to achieve scale, separating development risk from long-term ownership, creating credible operating platforms, improving revenue certainty or using government participation to address specific risks holding back investment.
03 Broaden the housing delivery and investment toolkit Move beyond a one-size-fits-all approach to housing supply. Match housing products and delivery models to the needs of particular communities, markets and workforces, and consider where housing can function as enabling infrastructure. What this means in practice Expanding established products such as build-to-rent, social and affordable housing, and specialist accommodation, while developing new models for worker housing and more diverse lower-density rental products where demand and investment fundamentals support long-term delivery.
Govern around outcomes, not
individual mandates Establish whole-of-government mechanisms that can consider housing projects collectively, balance policy objectives and commercial realities, and resolve trade-offs.
What this means in practice A focus on achieving the broader housing outcome, rather than individual portfolio decisions that inadvertently prevent otherwise viable projects from progressing.
Australia’s housing challenge will not be solved by any single tenure, funding mechanism or level of government. Nor will it be solved through supply targets alone. Delivering housing at the scale required demands a coordinated approach that aligns policy, capital and delivery. The opportunity is to move beyond individual housing initiatives towards a housing delivery operating model. This means aligning government decision-making, structuring investment opportunities around the capital required for delivery, and developing housing products that respond to the needs of the communities they are intended to serve.
14
CUSHMAN & WAKEFIELD / THE HOUSING OPERATING MODEL
Want to learn more?
To explore the research findings and what they mean for your organisation, contact Alan Herrman or Danielle Cox. Our Strategic Consulting team partners with private, government and non- profit clients to unlock housing investment opportunities that deliver strong financial returns alongside positive social impact.
Alan Herrman Head of Strategic Consulting, Australia & New Zealand Managing Partner
Danielle Cox Director Strategic Consulting, Australia and New Zealand
M: +61 431 136 080 E: danielle.cox@cushwake.com
M: +61 437 428 378 E: Alan.Herrman@cushwake.com
About Cushman & Wakefield
Cushman & Wakefield (NYSE: CWK) is a leading global commercial real estate services firm for property owners and occupiers with approximately 52,000 employees in nearly 400 offices and 60 countries. In 2024, the firm reported revenue of $9.4 billion across its core service lines of Services, Leasing Capital Markets, Valuation and other. Built around the belief that Better Never Settles, the firm receives numerous industry and business accolades for its award-winning culture. For additional information, visit www.cushmanwakefield.com.
Page 1 Page 2 Page 3 Page 4 Page 5 Page 6 Page 7 Page 8 Page 9 Page 10 Page 11 Page 12 Page 13 Page 14 Page 15Powered by FlippingBook