Local Market Data
UPSTATE NY
VANCOUVER (LC)
2024 2025 2026
2024 2025 2026
Misc. Architectural Trades
Misc. Architectural Trades
$4.71
$5.01
$5.11
5.41
5.89
5.74
Arch. Millwork
$7.42
$7.38
$7.53
Arch. Millwork
12.91
11.32
11.97
Doors, Frames, Hdwr
Doors, Frames, Hdwr
$13.67
$13.66
$13.93
38.24
26.89
24.33
Drywall, Acoustic, Carpentry
Drywall, Acoustic, Carpentry
$22.67
$23.09
$23.55
24.32
21.88
22.69
General Finishes
$10.42
$10.47
$10.68
General Finishes
16.96
11.41
15.95
Mechanical, Plumbing, Fire Protection
Mechanical, Plumbing, Fire Protection
$27.27
$28.01
$28.57
29.09
27.65
30.31
Electrical
$35.36
$36.58
$37.31
Electrical
32.03
41.84
46.20
General Requirements, General Conditions & Fee
General Requirements, General Conditions & Fee
$15.19
$14.99
$15.29
15.28
16.36
24.32
Contingency
$13.48
$13.22
$13.48
Contingency
15.90
16.96
17.61
Total
$150.19
$152.41
$155.46
Total
190.14
180.20
199.12
WASHINGTON DC
2024 2025 2026
Misc. Architectural Trades
$4.47
$4.17
$5.89
Arch. Millwork
$8.74
$10.17
$9.01
Doors, Frames, Hdwr
$16.62
$15.65
$14.01
Drywall, Acoustic, Carpentry
$18.03
$16.88
$20.41
General Finishes
$8.68
$7.24
$9.44
Mechanical, Plumbing, Fire Protection
$21.57
$29.13
$25.91
Electrical
$32.45
$35.57
$37.98
General Requirements, General Conditions & Fee
$13.46
$10.39
$11.65
Contingency
$11.37
$12.69
$8.58
Total
$135.39
$141.87
$142.88
Notes: Currency is USD unless otherwise indicated; LC=Local Currency All costs are generation 1 Generation 2 costs have a 10-15% discount
58
59
Cushman & Wakefield
Office Fit Out Cost Guide 2026
Powered by FlippingBook