Office Fit Out Cost Guide Americas 2026

Americas Office Fit Out Costs PDS Americas Fit Out Guide – Construction Pricing Criteria

Generation 1 Project Description: The Generation 1 tenant improvement project (Gen 1) scope and related costs are based on modern-day corporate office space with private offices, office workstations, executive areas, reception, training rooms, conference rooms and all other associated ancillary space customary in a corporate facility. Low Voltage Cabling, Audio Visual Equipment, Security, Furniture and other Furniture, Fixtures & Equipment (FF&E) items are excluded from the pricing. Given the fluidity of the construction market, a ten percent (10%) contingency allowance has been included in the cost. Generation 2 Project Description: The Generation 2 tenant improvement “adaptive reuse” project (Gen 2) scope and related costs are based on all the design criteria of the Gen 1 project except for the adaptive reuse scope described as follows: • Selective demolition of the existing tenant improvements including finishes, partitions, ceilings and mechanical/electrical systems • Reuse 25% of existing partitions and ceiling systems

• Reuse 25% of existing sprinkler head locations • Reuse 80% of perimeter zone air distribution • Reuse 20% of interior HVAC zone air distribution

• Reuse 100% of existing electrical distribution infrastructure • Reuse 25% of existing electrical power & lighting distribution • Reuse 100% of existing fire alarm main loop with 75% new and 25% relocated devices

26

27

Cushman & Wakefield

Office Fit Out Cost Guide 2026

Powered by